/ABOUT THE PROJECT
Farahi Group of Companies (the developer) is planning an exciting new high-density residential development on two vacant blocks of land they own at 530 & 540 Exmouth Street (situated between Exmouth Street and Highway 402), in Sarnia ON.
With the support of Siv-ik Planning and Design Inc., an Official Plan and Zoning By-law Amendment application is being prepared which would permit the development of two (2) new mixed-use buildings, each containing two (2) high-rise residential towers and a series of small-scale commercial spaces integrated into the base of the building (i.e., podium) at-grade.
We understand that change in neighbourhoods warrants conversation. This website provides an opportunity for those who are interested to learn about the vision for the site and to share their thoughts. The project team is committed to engaging with local residents throughout the process.
Learn More
The preliminary concept plan prepared by Baird AE | Architecture & Engineering envisions the development of two distinct buildings that include a total of four (4) new 23-storey residential apartment towers, containing a total of 848 residential units (to be constructed in phases over time). A total of 1062 new parking stalls will be developed with the project, most of which will be “structured parking” that is integrated into the design of the base structure of the buildings. Approximately 9,000 square feet of new commercial space will also be developed within the base portion of the new buildings. The existing vehicular access point along Exmouth Street will be maintained and the development will utilize the existing network of vehicle circulation lanes that are already in place and serve the adjacent commercial developments (e.g., Shopper’s Drug Mart, Metro, etc.)
Once the required Official Plan and Zoning By-law Amendment Application is submitted, you will receive a formal notice from the City of Sarnia, notifying you of this application and inviting you to provide comments. At that time, you will be able to access the files from the "Speak Up Sarnia" projects page and be able to provide comments directly to the City Planner assigned to the file.
This website is part of our “developer-led” communications/engagement program that provides another easy and accessible way for residents to learn about the project and provide feedback.
To learn more about the preliminary concept plan, please download the project backgrounder and preliminary architectural plans below.
April 2024
November 2023
/PROJECT STAGES
SEPT - DEC 2023
CONCEPT PLAN DEVELOPMENT
JAN - MAR 2024
APR - JUN 2024
OFFICIAL PLAN & ZONING BY-LAW AMENDMENT APPLICATION
JUL - SEPT 2024
OCT - DEC 2024
SITE PLAN CONTROL APPLICATION AND BUILDING PERMITS
/PROVIDE FEEDBACK &
STAY INFORMED
To ask a question, provide feedback, or sign up for email updates use the contact form below.
/HOW IS MY FEEDBACK USED?
Feedback received through our outreach program will be used to inform our understanding of the local context and, where possible, shape some elements of the design of the project. We acknowledge that change is difficult and that no outcome will satisfy all interested parties completely. As such, the project team cannot integrate everything suggested by our neighbours and the community at-large. However, we commit to:
-
Providing you with quality and up-to-date information about the project.
-
Helping you to understand how you can participate in the process.
-
Asking for your thoughts and perspectives.
-
Sharing what we have heard and our team’s response to it.
/ENGAGEMENT OPPORTUNITIES
UPCOMING EVENTS
Check back or sign-up for future events.
PAST EVENTS
Virtual Community Information Session
Date: December 6, 2023